As of  June 15, 2015 there are new requirements for  septic plan reviews for systems in North Hampton.

-For electronic submittals: It is required that a paper copy of the plan is submitted to RCCD with a stamped envelope addressed to the Town.
-For paper submittals: It is required that an additional paper copy of the plan is submitted to RCCD with a stamped envelope addressed to the Town.

Town of North Hampton
Building Department
233 Atlantic Avenue, 2nd Floor
North Hampton, NH 03862-0710

An additional $25.00 fee will be applied to those submittals who do not comply with this requirement, and the plan will not be reviewed until this fee is paid (or the paper copy and  stamped envelop is submitted)

Thank you for your cooperation.

-RCCD